Marine works / Construction flow and estimating
Follow the incoming releases on each card. Packages on different branches can overlap where vessel access, exclusion zones and plant availability permit. Open a package for the working method, plant spread, productivity basis, survey checks and receiving party.
Use accepted quantities in the units shown and output per productive hour. Paid hours drive spread cost. Workable hours drive production. Override the workable window on a row where tide, navigation or lifting access limits that operation. A blank override uses the common window.
The illustrative bay has 2,400 bank m³ of dredging, eight driven piles, 300 m² of filter footprint, 240 t of armour and 160 m² of deck. Two barges carrying 200 bank-equivalent m³ each on four-hour cycles can support 100 m³/h. A dredger capable of 140 m³/h is therefore entered at 100 m³/h. At 0.4 piles per productive hour and five workable hours per shift, eight piles require four shifts. Replace these illustrative inputs with project records.
| Package / unit | Quantity | Output / productive h | Workable h / shift | Release wait (shifts) | Spread AUD / paid h | Variable AUD / unit | Fixed AUD | Work shifts | Start shift | Release shift | Direct AUD |
|---|
Start is the latest incoming release. Release includes productive duration and any inspection, curing or access wait entered in shifts. Estimates use fractional shifts. Charge shared plant once across concurrent activities. Price standby, remobilisation or other wait costs explicitly. Enter zero for a known zero cost and leave unknown costs blank.
Record the disposition for each package against its named evidence and receiver. A release counts when it has an evidence reference, reviewer and date, and every incoming package has a complete release. The authorised project reviewer decides acceptance against the applicable drawings, specifications and survey limits.
| Package / required handover | Disposition | Evidence reference | Reviewer | Date | Release check |
|---|
Programme inputs and handover records are saved in this browser for each route and workfront. The JSON export includes the lot inputs, calculated shifts, release requirements and evidence references.
Take quantities off the PDF drawings in Spark, then build the rate from labour, plant, materials and productivity in Trinity.